News 

A Five Step Guide to the Tenant Buildout Process

Step 1: Narrow Your List To begin, hone in on what your needs are versus your wants for the space and narrow down your search to the top two to three options. Having a short list will help to simplify your ability to compare and contrast your total cost for each space. Step 2: Develop a Space Plan A space plan is a detailed layout or design that shows the contractor how you intend to use your space. The best way to do this is to hire an architect or…

Read More
News 

October Closed Transactions

While volume remained steady with 17 closed transactions for October equating to more than 420,000 square feet, we had an exceptional month in terms of the size and significance of the transactions that were closed. The Sheeran-Semon Team of Dan Sheeran Sr., Dan Sheeran Jr., and Mike Semon had both of the largest transactions of the month with a lease signed by TP Mechanical Contractors at 1675 Watkins Road. TP Mechanical will use the 290,573-square-foot space for fabrication and distribution. Reading Rock signed a lease at 2646 Morse Road. Cincinnati-based…

Read More